SheetFed Offset G7 Qualification Kit 2010
This is the Sheetfed Offset Qualification Kit updated in 2010.
Use this kit during the G7 Master Qualification Process to record the settings of the conditions of the production facility at the time of qualification and calibration. A copy of this kit should remain with the production facility and also be retained by the G7 Expert Consultant. It is not required to send in a copy of the kit to RIT for the submission process.

